What it is: a strategy for improving how work flows: make the workflow visible, limit the work in progress, and measure flow so you can improve it. Source: the Kanban Guide (version 2025.5, May 2025).

Fits: a stream of requests, fixes and small changes; live apps and retrofits (Part 14), where the gap register is the board; teams that want forecasts without estimates. It can sit alongside another method. Doesn’t fit on its own: a large fixed-scope contract that needs stage approvals (add E3 around it).

The strategy, in brief:

  • Three practices: define and visualise the workflow; actively manage the items in it; improve the workflow.
  • A Definition of Workflow states the work items, where work starts and finishes, the states in between, how work in progress (WIP) is limited, the explicit policies, and a service level expectation (SLE): how long an item should take, with a probability, such as “90% of items within 12 days”.
  • Four flow measures: WIP (started, not finished), throughput (finished per week), work item age (time since an unfinished item started) and cycle time (start to finish).
  • There are no required roles or meetings. The Kanban Method from Kanban University is a different, larger body of practice, with change-management principles, a set of cadences and optional roles.

Where Bansat fits:

Bansat In Kanban
G0 The first item, “Write the blueprint”, enters the board
FRs, gap register rows (14.4), bugs Work items on the board
Definition of Ready and Done (11.2) The policies for entering and leaving the board
G1 The “Write the blueprint” item is done before any build item starts
G2 A policy: no item that collects real personal data passes “Ready to release” before G2
G3 The release policy on the “Release” column: Part 13 green
G4 A regular review of the four flow measures, plus the 30-day review
Severity in the gap register (14.4) A separate SLE for Critical items, which go first

Agent notes: take the oldest item in progress before starting a new one; respect the WIP limit; say when an item has aged past the SLE rather than starting something else.

How it commonly fails: a board with no WIP limits or explicit policies, and flow measures collected but never used, so queues grow and items stall unseen.

Measures: the four flow measures, and the share of items finished within the SLE. Forecast from throughput, not estimates (11.8).